What should I pay attention to when installing a check valve?




The following points should be noted when installing a check valve:

Installation location: The check valve should not be installed on the main pipeline, but on the branch sewer pipe to play its due role. You can choose to install it horizontally or vertically, depending on the space distance. During the installation process, be sure to pay attention to the water outlet direction indicated by the arrow mark to avoid installation errors.

Installation method: Please refer to the product manual and installation drawings for installation. To ensure the quality of installation, it is recommended to contact professional construction personnel to assist in the installation. After the installation is completed, wait at least 3 hours before turning on the water source to ensure that the check valve works properly.

check valve

By properly installing and using the check valve, you can effectively prevent the backflow of the medium, protect the system equipment and maintain the system pressure, and ensure the safe and stable operation of the pipeline system.

Navigation